Saturday, January 11, 2014

Gravel layer

The gravel layer is installed on the 2 greenside bunkers on 16, the greenside bunkers on 18 and the bunker on 1.  The bunkers on 7 are currently being cleaned out and 2 will be next. The gravel layer will be installed following clean-out and drainage. 
Installing gravel in 18 bunker to a 2 inch depth

Back bunker on 18 with gravel layer complete

No comments:

Post a Comment