Bunker project update

The bunker project continues to go smooth.  So far the greenside bunkers on 16, 18, 1 thru 5 and 7 thru 9 all have sand in them.  The gravel was sprayed with the polymer in 10 thru 13 yesterday and sand is getting installed in those bunkers today.  The old material was removed and drainage repaired in the bunker on 14 yesterday and gravel was installed.