The front bunker on 7 looks to have shrunk so we are re-establishing the edge. The right side bunker on 7 has a stretch of drainage that needed to be installed where none existed before.
Cutting a new edge on the front bunker #7
Edging front of 7
Digging the trench for the new drain line in the right bunker #7, where none existed before
No comments:
Post a Comment