Saturday, January 9, 2016
Wood Chipping
We got a chipper on property this week and started chipping the stockpiled wood on 15. Once 15 is finished we will move over to the area between 1 and 9.
Thursday, January 7, 2016
Back DR Tee Amenity Area
We reconstructed the retaining wall on the back driving range tee this week. The old one was rotten and falling apart.
Subscribe to:
Posts (Atom)